Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Nickel Creek Platinum Corp NCPCF


Primary Symbol: T.NCP

Nickel Creek Platinum Corp. is a Canada-based mining exploration and development company. The Company’s principal business activity is the exploration and evaluation of nickel and platinum group metals (PGM) mineral properties in North America. Its flagship asset is its 100%-owned nickel-copper PGM project, located in the Yukon Territory, Canada (Nickel Shaw Project). The project is in the southwest of Canada's Yukon Territory, approximately 317 kilometers (km) northwest (NW) of the capital, Whitehorse. The Nickel Shaw Project is a large undeveloped nickel sulphide project, with a unique mix of metals including copper, cobalt and platinum group metals. The Nickel Shaw Project has access to infrastructure, located three hours west of Whitehorse via the paved Alaska Highway, which further offers year-round access to deep-sea shipping ports in southern Alaska. The Company also maintains environmental baseline activities, considers optimization alternatives and seeks other opportunities.


TSX:NCP - Post by User

Post by Wangotango67on Feb 03, 2024 6:32pm
131 Views
Post# 35861477

250 / T SOLUTION

250 / T SOLUTIONI'd ring a ding - Saskatchewan Research Council
I'd ask them to build a ( multi - solution bank ) with electrolysis
Using special resins to selectively target - nickel, plats, exotics, cobalt, etc....

I'd utilize Canada's Critical Mineral assistence - 30% for extractives
Which aligns with Canada's approach - collaborating with research + tech

SRC has also built a commercial-scale Solvent Extraction Unit that has six stages of mixers and settlers (each stage has a capacity of ~1,200 litres) and is used to improve the impeller design, process control, and mixing and separation efficiencies.

https://www.src.sk.ca/blog/designing-solvent-extraction-cells-rare-earth-element-supply-chain



I'd target 200 - 300 tonnes of, veined sulphies @ surface
Other nickel / plat peers don't have the veining @ surface

I'd access the " quartz " mining rights and submit a permit for,
bulk ore testing ( 200 - 300 tonnes )


In one fallow swoop,
i've averted the expence of, billions to spark up mining.
I've formed an alliance with, SRC.
Whereas, SRC now refines my ores.
= my mine costs have reduced to = simple trench and ship to SRC.

2012 wellgreen report
assays are defined into two categories
- 7TD2 = total dissolved using 4 part acid
- 3 B = fire assay

No assays given for, nickel under total dissolved 4 part acid
While, fire assay provides assay results
Therefore, solubilized nickel values would increase
overall,  ( total ) nickel value

SUM ?
I have just surpassed other nickel peers in, Canada.
I'm mining on the cheap.
I'm accessing SRC facilities in, Saskatchewan - they refine and make end metals
I'm accessing Canada's 30% extractive - assistence.

Higher recoveries are achieved through,
solution extraction + electrolysis


2200 lbs ( 1 tonne )
x 0.35% nickel
= 7.7 lbs Ni
x 250 raw ore tonnes
= 1,925 lbs Ni

Plus plat group, cobalt, exotics ( copper for wiring )


Hydrogen Production ( electrolyzers / very large fuel cells )
Hire Engineering Firm
Design hydrogen electrolyzer
Access another Canadian rebate for, green energy production


What do these large hydrogen electrolyzers look like ?

https://hydrogen-pro.com/2022/09/12/the-arrival-of-the-worlds-largest-electrolyser/

https://gasturbineworld.com/electrolyzer-advances/

https://www.hydrogennewsletter.com/top-commercial-electrolyser-for/

https://digitalpress.fra1.cdn.digitaloceanspaces.com/crm0zqz/2021/11/6B405A12-D1B6-4999-944F-8DA6E930637D.jpeg


Yes, lots of metal plates required for the electroplates.
= thick nickel plates coated in - plats - reduce dendrite accumilation

Next step ?
Team with a province such as BC who is onboard with, Hydrogen.
Heat - Electricity - Fuels such as, methanol / 95% reduction co2 emmissions.
Hone in on key locations securing - water accessibility / plug into energy hubs / grid


Final step
Find more contract locations, key water zones / close to grids to link in
REPEAT using 200 / 300 tonnes for each NEW hydrogen plant
= Your now an energy company
= Gaining years well ahead of competative peers
= Saving billions for start up  vs  few hundred tonnes style mining


<< Previous
Bullboard Posts
Next >>