What good is a tailings design with no ore.The bulk tailings design will not be approved by State agencies due to no liner to capture regulated contaminated process water. Pump-back wells will be required in adition to a "impermeable" liner.
That means the the bulk tailings will remain mostly saturated requiring enhancing the current embankment design for both static and psuedo-static analysis.