Year 2024 will determine SIZE OF TOTAL DEPOSITYear 2024 has three MAJOR CATALYSTS
(a) Flow sheet (can we recover 85% of the lithium?)
(b) Major drill program (extends way South and way West)'
- will test the limits of this deposit
(c) Hopefully PEA in Q4 to show that it is ECONOMICAL
YEAR 2025
(d) Infilling to bring inferred to indicated to RESERVE
(e) Hopefully PFS
Followed by BUYOUT......hoping for double digit range.
Good Luck,