RE:RE:RE:Cascade 2 Showing Signs of Life :-)Whwn both turbines go online, and take full loads they have to be sure that when they do take the loads other supplys are on standby, running on partial load. this plant is on the grid I would think and loads have to be controlled, the distribution trustworthy, with failsfes in place. Onganization with the system coordinated and tested, all senarios thought out and backup plans with communications in place. They wouldn't want to cause major power failures with reprocutions that could cause.
They have parrelled both units, it is happening. I'd bet they are they are thermoing connections, after having commisioning the project. Permiting takes time, wishing the team all the best, I'd bet loss of sleep and stress is common, maybe that is behind them. It seems it hasn't been rushed, accountants do that.