RE:If NFG has made a decision on toll miningNFG hired Ronnie in 2022 to prepare for a decision to Early mine .
Within 2 weeks of MAE acquiring Point Rousse, NFG had their Tolling arrangement .
NFG have high grade open pit ore.
It can only be processed at Point Rousse .
Firefly only have 1500 tpd Nuggett Pond mill.
Not nearly enough for their production plans.
Point Rousse capacity can double that, leaving us with the Nuggett Pond facility with its copper concentrate circuit.
Firefky already has a JV arrangement for Point Rousse with MAE.
It needs Gold and MAE TSX listing .
One way or another, economics suggest that one of these will buy out MAE.