RE:RE:RE:RE:RE:RE:RE:RE:RE:lots going on behind the scenesThis started to smell right from the length of time it took for the OZA 1 Well re-entry to be completed. The company mentioned after that they would be ready for pipeline injection. As it turned out they did not even have a crude handling agreement to move the Oil and it took months and months for that too get signed and then shortly after no pipeline availability. They switched to what was too be a fleet of over 20 trucks to move the Oil from the Oza Field but then they had trouble getting permits to truck the OIL.Then they only produced at around thirty percent of Capacity. Then you have the case of the missing funds from the 7800 barrels injected into the Umugini pipeline to the Trans Forcados terminal. So was this Company built to succeed or fail for someone elses benefit? I have my beliefs but no proof of what actually happened on the ground in Nigeria.