Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Suncor Energy Inc T.SU

Alternate Symbol(s):  SU

Suncor Energy Inc. is a Canada-based integrated energy company. The Company's segments include Oil Sands, Exploration and Production (E&P), and Refining and Marketing. Its operations include oil sands development, production and upgrading; offshore oil production; petroleum refining in Canada and the United States; and the Company’s Petro-Canada retail and wholesale distribution networks (including Canada’s Electric Highway, a coast-to-coast network of fast-charging electric vehicle (EV) stations). The Company is developing petroleum resources while advancing the transition to a lower-emissions future through investments in lower-emissions intensity power, renewable feedstock fuels and projects targeting emissions intensity. The Company also conducts energy trading activities focused primarily on the marketing and trading of crude oil, natural gas, byproducts, refined products and power. It also wholly owns the Fort Hills Project, which is located in Alberta's Athabasca region.


TSX:SU - Post by User

Comment by ztransforms173on May 26, 2024 12:36pm
179 Views
Post# 36057988

RE:Cogeneration Project Nears Finish Line

RE:Cogeneration Project Nears Finish Line- NOT ONLY REDUCING NASTY POLLUTANTS {CO2 is NOT a NASTY POLLUTANT} but GENERATING SIZEABLE REVENUES from SELLING ELECTRIC CURRENT into the Alberta GRID

- look at MEG Energy for comparison: 

* 2 X 101 MW co-generation plants (Christina Lake)

Suncor Energy BASE PLANT co-generation:

* 2 X 402 MW co-generation plants 

- what is NOT usually MENTIONED in the NEWS RELEASES is that they had to BUILD NEW
HIGH-VOLTAGE TRANSMISSION LINE CONNECTIONS in order to ACCESS the Alberta ELECTRIC GRID


^^^


Suncor Base Plant Cogeneration Facility Connection (2082)

Suncor Energy Inc.(Suncor) has applied to the AESO for transmission system access to connect its approved Suncor Base Plant Cogeneration Facility(Facility) in the Fort McMurray area. Suncor’s request can be met by the following solution:

  • Add two 240 kilovolt (kV) circuits to connect the existing Voyageur 29EDD-94 substation to the existing Thickwood Hills 951S substation.
  • Modify the Thickwood Hills 951S substation, including adding three 240 kV circuit breakers.
  • Add or modify associated equipment as required for the above transmission developments.
https://www.aeso.ca/grid/transmission-projects/suncor-base-plant-cogeneration-facility-connection/

***

-
you DON'T pull ELECTRICITY OUT of THIN AIR

- GENERATING, TRANSMITTING and DISTRIBUTING electricity is a VERY CAPITAL-INTENSIVE and HIGLY-ENGINEERED PROCESS