New ArticleGold Terra Resource Looking To Delineate Multi-Million Ounce Deposit At Yellowknife City Gold Project, Just Raised C$2.5M - criticalinvestor.eu
I thought this part of the article gave the timelines:
- Catalysts
Although Gold Terra is already backstopped by 1.78Moz Au in resources, the markets still treat it as a binary exploration play for now. Therefore, only solid drill results that could set the company on a path to a deep, economic 1.5Moz Au resource will have impact. As Gold Terra has almost reached its target depth for the master hole, a compelling drill result from hitting the Campbell Shear is an important catalyst. This master hole will then be followed up by a series of directional holes, taking up far less time to be completed and assayed.
- Drill results for the master hole 056, expected by the end of June, followed by a summer break
- Drill results for the first set of 2-3 directional holes, expected by the end of October
- Other catalysts for 2025 and beyond include:
- 2025 drill program of 5000 to 10,000m aiming for the Campbell Shear high grade target below Con Mine
- Winter 2025 drill program of 10,000m aiming at the Campbell Shear near the C1 shaft
- Winter 2025 drill program of 10,000m aiming at the Campbell Shear North of town + Zone 14
- 2025 Updated Resource / PEA (Target +2 Moz at Con Mine)
- 2026 PFS / FS completion = Production decision