Assays from Deep Drilling Paired to Seismic signal indents These 12 holes were drilled within but below the known mineralized foot print for each of the five high grade zones to test down dip step outs targets derived from the 3D Seismics
Drilling began in early March, and by early June a total of 10,345 metres had been completed in 12 drill holes ranging in length from 550 to 1,230 m.
My assumption is that these 12 holes were re entry holes, beginning perhaps 350 m or so below the surface .
If correct , the deepest hole perhaps had reached a TD of 1500 meters or so with the shallowest reaching about 900 meters.
Devico is now Re entering these bores to side step, by directional drilling, to test structures known to be mineralized in core data that correlate well with seismically defined structures.
If these assumptions are correct, we could see initial assays at depths below the 350 m vertical depth within a month or so assuming a 4 month turnaround .
Likewise, serial assay releases as they are received at deeper depths from these 12 drill holes down to 1500 m or so below the surface .
Such would make for a very interesting summer of assay releases, interwoven with initial side step assays from Devico.