Prediction Success of FS Drilling Index GLTA
In cant believe I am doing this as its so obvious.
Can V Lake and Goldboro accurately predict Lynne Lake pit size in ore volumes ?
V Lake ....1420 X 221400 = 314 ,000 tons
Goldboro...1750 X 221400 =387,000 tons
Average ............................=
350,000 tons Actual .................................
.272,000 tons The under estimation error is just 6 %
and so on with the other two permutations
Conclusion is obvious ....highly predictability success
OPen Pit Mine | Drilled Meters | Pit ore Volume ( m tons ) | Ore Volume / meter drilled (tons |
| | | |
Valentine Lake | 428000 | 607 | 1420 |
Goldboro | 81000 | 142 | 1750 |
Lynne | 221400 | 372 | 1680 |
| | | |
Average Volume/ Meter | | | 1600 |