RE:RE:Very Rough Proxy Based Scoping of FDP MREThank you.
Drilling through continous mineralization substantiallly reduces the number of drill holes needed for an initial MRE, as is clearly exhibited by the Snowline MRE which required less than 28,000 meters .
The 50 meter grid drilling pattern now being employed at FDP is consistent with required MRE standards of drilling density, so the extended drilling time there is clearly directed by that requirement .
In short, when reported, an MRE for FDP will be included in the assay report. along with an updated Butia.
We are in exciting times..