Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Victoria Gold Corp VITFF

Victoria Gold Corp. is a gold mining company. The Company’s flagship asset is its 100% owned Dublin Gulch property, which hosts the Eagle, Olive and Raven gold deposits along with numerous targets along the Potato Hills Trend including Nugget, Lynx and Rex Peso. Dublin Gulch is situated in the central Yukon, Canada, approximately 375 kilometers (km) north of the capital city of Whitehorse. The property covers an area of approximately 555 square kilometers and is the site of the Company's Eagle and Olive Gold Deposits. It also holds a suite of other development and exploration properties in the Yukon, including Brewery Creek, Clear Creek, Gold Dome and Grew Creek. The Eagle West target area lies as close as 500 meters northwest of the main Eagle Gold Deposit and hosts the exposures of the granodiorite. The Raven target is located at the contact zone at the extreme southeastern portion of the Nugget Stock. The Brewery Creek Project is a past producing heap leach gold mining operation.


GREY:VITFF - Post by User

Comment by mdjbrownon Jul 04, 2024 9:43am
106 Views
Post# 36117831

RE:RE:RE:More information about the landslide

RE:RE:RE:More information about the landslideThere is no doubt Swingandmiss that the insurance provider will be trying their best to minimize any loss, but if this accident was caused by human error and not an engineering design failure, they will be on the hook.

We know for fact the Engineer of Record was required to conduct an inspection of the HLP by July 2, 2024, so when was that indepth inspection completed?

Also, if I recall a factor load built in to the engineering back stop equation was 1.5, so does that calculation cover a 100 ton piece of equipment dropping into the top of the HLP?

In speaking with others including a Geosoils Engineer, a loose packed slope of material made up of 10 mm rock would not withstand dropping a 100 ton force at the summit.

It is an undisputed fact that a bulldozer is sitting in the HPL slide aftermath, so what is it doing there?


<< Previous
Bullboard Posts
Next >>