GREY:VITFF - Post by User
Comment by
nincompoopon Jul 05, 2024 6:36pm
99 Views
Post# 36120660
RE:With all the experts on CBC explaining the magnitude of the
RE:With all the experts on CBC explaining the magnitude of the You really think a 100 ton dozer where the load is transferred by very wide, very long tracts is a possible cause of moving 4 million tons of ore. The pad was designed to have dozers leveling and moving ore regularly. That's how it became stepped. The pressure per square inch of track on the dozer on the pad would probably be less than a the pressure exerted by a man walking across it....hang on...we need Honey badger to work that out for us.