Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Trillion Energy International Inc. C.TCF

Alternate Symbol(s):  C.TCF.WT | TRLEF

Trillion Energy International Inc. is a Canada-based oil and gas producing company that strives to maximize shareholder value through a mix of offshore gas development and high-impact oil and gas exploration in Cudi-Gabar province SE Turkey. The Company is 49% owner of the South Akcakoca Sub-Basin (SASB) natural gas field, a natural gas development project with four offshore platforms, pipelines and gas plant located in shallow water black sea. The Company also has the Vranino 1-11 block, a prospective unconventional natural gas property in Bulgaria.


CSE:TCF - Post by User

Post by LionGate7on Jul 06, 2024 8:50am
230 Views
Post# 36120952

Summary of Key Activities and Progress

Summary of Key Activities and Progress


 

1 Perforation Equipment Arrives:

Our advanced R/U and PCE wireline equipment, essential for perforating additional gas pay and optimizing natural gas production, has arrived and is set up.

2 Pre-Work HSE Safety Induction:

Conducted a comprehensive Health, Safety, and Environment (HSE) safety induction to ensure all personnel know safety procedures and protocols.

3 Equipment Installation:

Install the Wellhead: Successfully installed the wellhead, forming the foundation of our well control system.

Mount the BOP Stack: Securely attached the Blowout Preventer (BOP) to the wellhead to maintain well control and prevent blowouts during operations.

Attach PCE: Connected lubricators and control equipment to the top of the BOP stack to manage wellpressure and ensure safe tool handling during operations.

4 Perform Testing:

Conducted thorough pressure tests to ensure the integrity and proper function of the entire setup. Thisincluded sealing the system, applying pressure, inspecting for leaks, and verifying the functionality of all components.

July 6:

Rig Up Tractors and Prepare Guns: All-day operation to rig up Welltec tractors on the Akakoca platform and prepare perforation guns.

7-July:

South Akakoca-2 Perforation: Weather conditions are forecasted to be unfavourable. Despite this, we will try to proceed with the operation and run in hole (RIH) for the SA-2 perforation.

8-July:

Guluc-2 First Perforation: Scheduled first perforation at Guluc-2.

9-July:

Guluc-2 Second Perforation: Scheduled second perforation at Guluc-2.

10-July:

West Akakoca-1 First Perforation: Scheduled first perforation at WA-1.

11-July:

West Akakoca-1 Second Perforation: Scheduled second perforation at WA-1.

12-July:

Akakoca-3 Perforation: Scheduled perforation at A-3.

13-July:

R/D WLU: Rig down wireline unit.


Weather Conditions:

 

Operations are dependent on favourable weather conditions. While we have plans in place, adverse weather may cause delays. We are closely monitoring forecasts and will adjust our schedule as necessary to ensure the safety of our operations and personnel.