GREY:VITFF - Post by User
Post by
mdjbrownon Jul 10, 2024 9:33pm
207 Views
Post# 36127573
Looks like VG was trying their best to ensure
Looks like VG was trying their best to ensure water modelling was accurate at Eagle. Lots of engineering firms involved.
https://emr-ftp.gov.yk.ca/emrweb/COMM/major-mines/eagle-gold/emr-mml-eg-hlf-2023-annual-water-balance-modeling-report.pdf
"4.2 Stochastic Modeling
All stochastically generated climate datasets are presented on a weekly basis. There is a 0% probability of overflow from the In-Heap Pond at any point in 2023 for the HLF model results presented herein. As noted above, this model does not incorporate all the site-wide water management strategies, specifically surrounding the Events Pond which is captured in the site-wide water balance and water quality modeling."