what mining plan?the details of bringing Tucano's non-operational northern Brazil mine ("produced highest grades in the world, 2012-2014...") are missing some key stuff.
Tucano claims the Duckworth UG has 10m+ intercepts of 50-ish Au oz/tonne grades just below the pit.
It's Investor Presentation allso says "Duckworth UG 2026" production, in the hub-spoke slide.
there are like 4? 6? holes that go below the incredibly steep-walled Duckworth OP.
Four to six holes don't:
allow an indicated or measured reserve.
a conceptual or PEA-level mining plan.
a decision any third party would want to bankroll for development.
this is important because the grades at bottom of Duckworth OP are like 10x those of almost every other deposit on the project. If those grades aren't consistent enough to mine, or need to be drilled off first, the "2026" production from UG at Duckworth is going to be more like 2030 - not 2026.