RE:Tunnel route (working this time)This is an image I created showing the tunnel overlay from the SEA PDF Cobrashelby posted (thank you) with the Tudor property layout. I redrew the tunnel line so it was easier to see. Anyway the tunnel plows (as per current SEA mining plan) directly through GS, and through CBTS and hits a 1/4 of PS.
No way thiis goes through according to the plan SEA submitted.