RE:RE:A STRONG RESPONSEWorley is likely tweaking the build quality of the "pots" and improving overall engineering. The next "pots" need to be ordered and installed then tested. Ideally the new pots arrive in 2024.
The FEL3 study w/Worley should be complete in Q2 of 2025.
The 25000 pot facilty would likely see Gen-3 pots installed.
While these tweaks are being made, I can see a joint venture being signed whereby Quebec greenlights the project. Land gets prepared.
Again, waiting for Nano to complete all stages and then signing a deal means a plant won't be ready until 2026 or 2027. Way too slow. China will own the world by then.