Capital raise Advances Storm Copper IMO,.drawing thoughts here from Daves recent u-tube videos,.
Dave, mentioned from a Logistics perspective, the open - pit @ Cyclone was all enginerred in detail, alone with the air quality air station in place. On-going talks with Nunavut Governing parties. Sea-lift docking and removal of bulk sample.
Permitting in advanced stages with Time lines depending on a PFS.completion.
AWM,.must now finance, extention of air strip at work site along with moving entire camp site over to new cyclone deposit which would save time on all fronts. Drilling in 2025 will again target the deep sections and new zones.
ps,.AWM,. in this next phase of advancing Storm forward will require major Capital..This Capital raise by AWM, must also include BAYS 20 % FREE CARRY RIDE , which adds to AWM bottom line,
Let The Drills Be Our Friends
Traps7