RE:RE:RE:timeline / things to comeMust be rather embarrasing when TUD is bosting Supercell Results to post this !!
SEA Results
Initial Drill Hole Results 2024 Program at Snip North
Drill Hole ID | Total Length (meters) | From (meters) | To (meters) | Interval (meters) | Au (g/t) | Cu (%) | Ag (g/t) | Mo (ppm) |
SN-24-17 | 1129.8 | 373.0 | 675.9 | 302.9 | 0.75 | 0.10 | 3.0 | 52 |
Including | 595.0 | 650.0 | 55.0 | 1.14 | 0.07 | 1.0 | 14 |
SN-24-18 | 1228.0 | 86.5 | 564.5 | 478.0 | 0.49 | 0.13 | 1.5 | 84 |
Including | 233.5 | 282.6 | 49.1 | 0.83 | 0.22 | 2.5 | 60 |
Including | 326.1 | 419.0 | 92.9 | 0.68 | 0.25 | 2.2 | 186 |
Including | 484.0 | 506.0 | 22.0 | 0.96 | 0.28 | 2.2 | 120 |
SN-24-20 | 1061.7 | 124.5 | 656.0 | 531.5 | 0.48 | 0.10 | 1.2 | 69 |
Including | 363.0 | 612.0 | 249.0 | 0.54 | 0.17 | 1.6 | 120 |
Including | 410.0 | 546.0 | 136.0 | 0.69 | 0.20 | 1.7 | 163 |