A comparison IAU vs PRBPRB market cap $288 million, 10+ mm oz zero infrastructure, no power to the site, no buliding, no crusher , no leach pads, no nothing except their resource.. A billion required to $600 - 800 MM a mine Time line 2- 3 years
IAU.. 10+ MM oz , $246 MM market cap, and infrastructure that needs to refurbish the roaster.$ 200-300MM?... already in production (small at this time) POWER , roads Building shop etc etc...In Nevada+
JMHO this is still worth the $1.60 it was trading at 2 weeks ago... bought more today as well....