Post by
tire9 on Jul 07, 2011 12:55pm
Testing
Must be testing and it wouldn't suprise if the wells in the Ethel pool were producing at a high rate. 20,000 ++ BBL/day battery and treating station coming soon to Ethel. PIPELINES???
Comment by
teevee on Jul 07, 2011 1:15pm
It would be good if ARN could match or beat Coral's flush production numbers of about 2.000 b/d:-)
Comment by
tire9 on Jul 07, 2011 2:09pm
Not good to frac and open large channels that have high prod rates. With waterflood the idea is to displace the oil not circulate thru channels. This makes for maximum recovery.The technicians, engineers seem to be doing everything right here.
Comment by
teevee on Jul 11, 2011 7:22pm
""No one should be expecting that, as Coral Hill is drilling a different formation with much higher permeabilities.""I seriously doubt that statement. ARN was in first by a long time and shot lots of seismic to make sure they acquired lands with the best permeability and porosity.