Post by
lithomon on Apr 05, 2018 1:05am
High Profit Margin Gold Mine for Cariboo B.C.
Great way to end the 525,000 feet of drilling to almost 2000 feet vertical depth with drill intersection grading 1.4 oz's Gold over 32.6 Feet.
That's just about the same result achieved when the drill program began in 2017.
You can join the data in between and arise at a conclusion that BGM is planning for a very profitable, High margin gold operation.
Mining & Processing operations are likely on the fast track.