DRILLING UPDATE SEPT 26
Bayfield Rainy River Drilling / Exploration Update, NW Ontario:
Rainy River Burns Block drill hole RR13-11W2 has been completed to 698 metres.
Current Rainy River Burns Block drill hole RR13-11W3 was wedged of mother hole RR13-11 at 397 metres down hole. The wedge is oriented to turn west and up to test an Intrepid shoot target above and to the west of holes RR13-11, RR13-11W1 and RR13-11W2.
We are at 437 metres as of morning shift change. Bit change occurred at the end of night shift with the wedge bit being replaced by a standard bit.
Last Reflex test at 437 metres shows azimuth of 339.3 degrees and inclination of 83.0 degrees. Hole RR13-11W3 is tracking right in line with the mother hole but at a significantly flatter angle. We are right on track to test the target.
Currently drilling through the complex package of meta sedimentary rocks which lie above the hanging wall quartz porphyry dacite.
Robert Marvin, P.Geo., CPG, VP Exploration for Bayfield Ventures is the Qualified Person as defined by National Instrument 43-101 and supervised both the project field work and the preparation of the technical information in this update.