CSE:RGX - Post Discussion
Post by
Atechnician on Sep 03, 2024 2:10pm
Repost
Atechnician - (3/28/2024 1:06:52 PM)
RE:RE:RE:Re
I have no doubt that the plant is real and the proccess works.
However, the abrasiveness of the feed stock grinding down everything in its path is a very big issue,
causing the module to become a very high maintenance unit.
The external components such as valves, pumps, pipings... can be dealt with without too much hassle, but the internal parts of the reactors and the liquid/solid seperator are expensive, time consuming and not easy to deal with, causing major delay every time there is a break down.
( For the safety of the plant employees, the high pressure piping system should be inspected and/or replaced regularly.)
Here I am hoping the module one is good enough to validate the 2.5 ton/day concept, but I do not think it is good enough for the longer term.
Hence the company said the next module will be different from the first one.
AT.
Be the first to comment on this post