Now if SHARC could only get its collaborative act together with TMG for a simultaneous retrofit at the suds factory, and as the down-the-drain specialists belly up side by side with the up-the-chimney wizards, it would be time to hoist a few at the cabana in the bamboo patch. What do ya sayiii?
OTTAWA, ONTARIO – TheNewswire - February 24, 2021 – Thermal Energy International Inc. (“ Thermal Energy ” or the “Company”) (TSXV: TMG ) an innovative cleantech company and global provider of energy efficiency and emissions reduction solutions, has been commissioned by a prominent multinational brewer to supply a turn-key heat recovery system to one of its North American sites. The system, valued at over $1,000,000, will feature two of Thermal Energy’s proprietary heat recovery technologies, working in tandem to reduce fuel use and minimize carbon emissions. While it will be the first time these technologies have been applied to the sector in this way, the order represents an established market for Thermal Energy, with the Company now working with three of the top five brewers worldwide.
Both the FLU-ACE ® condensing heat recovery unit and HeatSponge indirect heat recovery unit will recover waste heat exhausted from the site’s boilers. The energy will then be repurposed to heat the water required for three separate applications; reverse osmosis which removes contaminants, deaeration which protects the steam system from the effects of corrosive gases, and boiler makeup water.
https://stockhouse.com/news/press-releases/2021/02/24/thermal-energy-international-helps-prominent-beer-company-brew-up-more