Bulk Sample in full swing given recent Press Release.
Great to see progress of Bulk Sample, trucks are moving and the crushing plant is already to be tested and put into production. I wonder how many tons of rock can be crushed in a day, many of these size plants can do between 150 to 200 tons per day. The pads are ready to be put down, so it won't take long to crush and place 1,000 tons, also the trip is only 25 kms, thus everything should move nicely from here.
Also the precious metal diagnositc leach is another important step in the process of understanding the economics and viability of production. In addition, The permit is valid for two years, allowing for nine trench areas and 83 drill pads at Pilar. The permit will provide access for planned infill and step-out drilling along the 1.2-kilometre trend that remains largely untested at Pilar. I suspect drills will be starting soon, infill drilling will expand the resource and allow for an NI 43-101. Also, I am excited to see what is in this additional 1.2 km untested trend. - Samples Selected for Precious Metal Diagnostic Leach
- Bulk Sampling and Metallurgical Plant Conditioning Ongoing
- Local ISO Certified Lab, LTM selected for Analysis and Bulk Sample Quality Control
- Permit Confirmed for an Additional Two-years of Drilling and Trenching at Pilar