Independent Audit Confirms 30 tons a day CO2 production !!!
- First commercial deployment of an enzymatic carbon capture process;
- First carbon capture unit in the forest industry;
- First carbon capture from unpolished emissions of a lime kiln.
- First capture unit using only residual thermal energy in the form of hot water (and only 2.4 GJ/tonne-CO2) creating no parasitic load on the host plant, a critical factor in reducing the overall cost of carbon capture.
- First unit making extensive use of C-PVC as a low-cost material in a carbon capture unit.
- Total combined cost of the thermal energy and the electricity required by the Unit comes to only C$7.35/tonne-CO2 (or less than USD 5.00/tonne-CO2), which to our knowledge is an absolute low for a carbon capture unit of any scale.