Almost there
Overall, the FFT is intended to provide further verification of the permeability, leachability, and containment parameters needed for the successful application of the ISR mining method at Phoenixand is expected to validate and inform various FS design elements – including the expected production and remediation profiles. The operation of the FFT is planned to occur in three phases: (1) the leaching phase, (2) the neutralization phase, and (3) the recovered solution management phase.
As described above, the leaching phase and neutralization phase are now completed.
The recovered solution management phase is expected to commence in the spring of 2023, and involves separating the solution recovered from both the leaching phase and the neutralization phase into (i) mineralized precipitates and (ii) a neutralized treated solution. The mineralized precipitate will be temporarily stored on surface in storage tanks and the neutralized treated solution will be re-injected into a designated subsurface area.
Be the first to comment on this post