OTCQX:GTBAF - Post Discussion
Post by
flashcash on Apr 07, 2021 7:51am
News
Great Bear is pleased to announce the arrival of a sixth drill rig at the Dixie Project. The sixth rig is being added to accelerate the 2021 drill program, and along with the other five drills will continue to both infill and expand on the three main gold zones including the Hinge, Dixie Limb and LP Fault zones.
The Company's primary focus remains infill and expansion drilling of the LP Fault zone at 25 – 75 metre centres. However, there remain large undrilled gaps of 100 – 400 metres between existing drill holes in several areas of the LP Fault, and within the other Dixie Project gold zones where step-out and step-down drilling have already successfully expanded the zones, all of which remain open to extension. Upcoming drill activities are outlined below.
LP Fault zone:
- Step-out drilling to depths of approximately 800 vertical metres from surface (see news release of March 29, 2021) is planned along up to 4 kilometres of strike length of the LP Fault zone. This follows the recent successful doubling of the zone's known vertical extent with three deep drill holes completed along a 500 metre strike length segment.
- Drill hole BR-260 (see news released dated March 29, 2021) intersected 15.57 g/t gold over 3.05 metres in the LP Fault zone 790 metres vertically below the surface and approximately 400 metres down-plunge from the nearest hole. The intervening 400 metre gap requires follow up drilling for this and the other two recent deep drill holes.
- Approximately 1.2 kilometres of strike length of the southeast portion of the LP Fault zone has only been drilled on 150 – 200 centres to date and will require infill work (see news release of February 13, 2020).
Hinge zone:
- Drill hole BR-036 (see news release dated December 9, 2020) intersected 15.18 g/t gold over 4.90 metres in the deepest Hinge zone hole, 850 metres vertically below the surface and 510 metres down-plunge from the nearest hole. The intervening 510 metre gap in drilling requires follow up.
Dixie Limb zone:
- Drill hole BR-085 (see news released dated May 11, 2020) intersected 10.19 g/t gold over 19.0 metres in the deepest Dixie Limb zone hole, 740 metres vertically below the surface and 380 metres down-plunge from the nearest hole. The intervening 380 metre gap in drilling requires follow up, as does the along strike projection of the zone at depth.
Regional drilling:
- Regional targets such as the Arrow Zone (see news release of June 18, 2020) have seen limited follow up work and will require additional drilling.
Great Bear's progress can be followed using the Company's plan maps, long sections and cross sections, and through the VRIFY model posted at the Company's web site at www.greatbearresources.ca, which will next be updated in Q2 2021. All LP Fault drill hole highlighted assays, plus drill collar locations and orientations can also be downloaded at the Company's web site.
Be the first to comment on this post