TSXV:LBNK - Post Discussion
Post by
biggonads on Oct 17, 2022 3:53pm
LBNK completes hydrogeolocial study at Boardwalk
LithiumBank announces today the completion of the hydrogeological study and network design at their flagship Boardwalk lithium brine project. The final results have determined that the key hydraulic parameters within the assessment scope allows for consistent, high volume brine production over the assessment period. Furthermore, the reservoir parameters studied confirm the reservoir parameters required to sustain a sizable lithium-brine project over a long period of years - in this case, 20! https://www.globenewswire.com/news-release/2022/10/13/2533784/0/en/Boardwalk-Hydrogeology-Capable-of-Long-Term-Consistent-High-Volume-Lithium-Brine-Production.html
Be the first to comment on this post