VANCOUVER, British Columbia and IRVINE, Calif. – May 19, 2022 (Globe Newswire)
PowerTap Hydrogen Capital Corp (NEO: MOVE) (FWB: 2K6B) (OTC: MOTNF) (“PowerTap” or the “Company” or “MOVE”) is pleased to provide an update on its zoning application activities for its initial stations in Humboldt County in Northern California.
In the first half of May 2022, PowerTap Hydrogen Fueling Corp. staff and consultants, as well as an Andretti Group representative, appeared before the City of Fortuna Planning Commission for the public hearing to review the site design for the first Andretti station incorporating a PowerTap Gen3 modular blue hydrogen production and dispensing unit (MHPDU), to be located in Fortuna, in Humboldt County, California. The proposal for the site design, which consisted of proposed elevations, landscaping, building colors, and signage, was presented before the Planning Commission of the City of Fortuna for consideration.
The purpose of the public hearing was to review the site design and appearance of the hydrogen station to ensure that it is consistent with the city’s community design guidelines for that area of the community. With a 6-0 vote, Fortuna’s Planning Commission found that the proposed site design is compatible with the surrounding area, meets the criteria in the Fortuna Zoning Code, and will not be detrimental to adjacent property owners or the public at large. In finding that the approving the site design is in the public interest, the commission unanimously approved PowerTap’s site design. The approval was conditional upon a building permit application being submitted and approved prior to constructions, demonstrating compliance with the approved design review permit. A recording of the Planning Commission proceedings may be viewed at https://www.youtube.com/watch?v=xlYZKbG7am0.
With design review approval, the path is cleared for PowerTap to submit plans to the City of Fortuna to obtain construction and installation permits. Processing of these permits is expected to yield approvals in Q3/Q4 2022, with construction to follow.
PowerTap CEO Salim Rahemtulla commented “The outcome of the Planning Commission hearing at the City of Fortuna has provided the PowerTap team builds the momentum to speed the rollout of the PowerTap Gen3 units. The team is very excited to move forward with haste!”