Here is today's update, as per the Mega website:
Geological & Exploration Update – January 18, 2012
MH1103
Deep drilling exploration on drill hole MH1103 at the Headway High Grade Project has been suspended as a result of the current drill contractor, Layne Christensen, announcing they are ceasing all Canadian diamond drilling services effective immediately. As of January 16, 2012 the drill was at a depth of 2541 m.
As such, Mega is currently conducting extensive discussions in regards to securing a new drill contractor for the 2012 season.
Based upon the current drill locations, we have doubled the potential mineralized footprint and in the process have acquired much needed geological/geotechnical information that is essential to future definition drilling which will define the true width and depth of the high grade mineralization extensions. We have drilled for structure to locate the controlling features that host the mineralization and the next step is drilling for mineralization, grade and width.