nofluff on Nov 20, 2021 12:14pm
paste plant
is needed in ug mines and op mines.
Ug mines use the slurry for backfilling there verticle trending stopes.
The size for ph will b quite small. They do not need to run it much. At full capacity production of 5000 tons pd. It would need to produce about 1000 tons per day. Small plant would do that easy. They use up there tailings for that.
Maybe 2 million for plant.
nf
Comment by
patchh on Nov 20, 2021 3:14pm
NCI installed a Float Tank de-watering press.. i think they dry stak
Comment by
RockDoc1 on Nov 21, 2021 11:24am
No, not really. The mine is producing thickened tailings, more than half of which needs to go back underground as paste backfill. When the mine produces 5000 TPD, more than 90% of the material hoisted is waste, or more than 4500 TPD. They need to thicken 4500 TPD. Capital cost for a 4500 TPD paste plant is between $10M USD and $15M USD. RockDoc
Comment by
my69z on Nov 21, 2021 12:32pm
11 min mark, Randy says it's running & needs full commissioning so the larger stopes can be turned over much faster. Rich said the last fans are not needed to reach 3k tpd. Glta!
Comment by
Robertis1 on Nov 21, 2021 2:45pm
I'm with you nofluff. I believe it's going to be a great Christmas and January for NCU. Good Luck