Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum Savannah Resources Ord Shs SAVNF

Savannah Resources Plc is a lithium development company. The Company is focused on developing the Barroso Lithium Project in Portugal, Europe's spodumene lithium deposit. The Barroso Lithium Project contains significant spodumene lithium resources in Western Europe, consisting of five deposits, including Grandao, Reservatorio, Pinheiro, NOA and Aldeia. The Barroso Lithium Project is located in... see more

OTCPK:SAVNF - Post Discussion

Savannah Resources Ord Shs > Phase 1 Resource Drilling Completed
View:
Post by ScandiumPower on Feb 26, 2024 7:16am

Phase 1 Resource Drilling Completed

26 February 2024

                                                                                                         

Savannah Resources Plc

(AIM: SAV, FWB: SAV and SWB: SAV) ('Savannah', or the 'Company')

 

Barroso Lithium Project: Phase 1 Resource Drilling Completed

 

Savannah Resources Plc, the developer of the Barroso Lithium Project (the 'Project') in Portugal, Europe's largest spodumene lithium deposit, is pleased to announce the completion of the resource-related drilling in the first phase of its current two-phase drilling programme. The first set of assays from holes drilled at the NOA and Reservatorio orebodies have also been received showing excellent grades and continuity of mineralisation. These results, along with those still to be received, will be used to finalise plans for the second phase of drilling and will be fed into new resource estimates for the orebodies as part of the Project's ongoing Definitive Feasibility Study ('DFS').

 

Highlights:

·    First phase of DFS-related resource drilling at the Project has been completed. Phase 1 drilling for metallurgical and geotechnical purposes, will be completed during March 2024

·    The resource infill drilling programme was designed to upgrade existing Indicated and Inferred resources at NOA, Reservatorio, Pinheiro and Grandao to both Measured and Indicated categories so that it can be used to define a maiden JORC (2012) compliant Reserve as part of the DFS study.

·    In total 3188.5m were drilled across 39 Reverse Circulation ('RC') holes (3 with diamond tails) and 3 diamond drill holes

·    Results have now been received from 25 holes with the best assays reported including:

 41m @ 1.21% Li2O from 159m in 23RESRC038

 40m @ 1.17% Li2O from 70m in 23RESRC045

 11m @ 1.22% Li2O from 13m in 23NOARC040

 13m @ 1.12% Li2O from 31m in 23NOARC041

 8m @ 1.34% Li2O from 21m in 23NOARC036

·    Initial results received from two holes at Reservatorio show the lithium mineralised pegmatite continuing at depth and have returned 40m widths with excellent lithium mineralisation grades.

·    Results received to date from the NOA deposit confirm the continuity of the lithium mineralisation and have highlighted that the pegmatite continues to the northwest on the Mining Lease area, beyond the current envelope of the resource.

·    Diamond tails drilled at Reservatorio to access deeper parts of the pegmatite have returned notable pegmatite intersections, logging and sampling of these is currently underway.

·    Geotechnical diamond drilling has begun at NOA and Reservatorio, to aid in finalising the mine designs.

·    Geologia e Geotecnia Consultores Lda., a geological consulting firm from Portugal, has been appointed to carry out the preliminary geotechnical assessment.

 

Next steps:

·    Further assay results will be released as they are received.

·    Completion of phase 1 geotechnical and metallurgical drilling.

·    Planning for the second phase of drilling to be completed once all results are in hand.

 

The Company still expects to begin updating the JORC resource estimates on a deposit-by-deposit basis later this quarter




https://www.savannahresources.com/investors/rns-feed/rns-announcements/?rid=4469826
Be the first to comment on this post
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities