Says that production is currently around 2100 BOD. Here is the cut out of there current production:
Average annual production increased by 42% to 1,159 net boed compared to 814 net boed in 2011,
despite the impact of shut in production due to continuing facilities debottlenecking. Stream’s activities in
the fourth quarter of 2012 focused on completing its surface infrastructure program and increasing oil
production through Gorisht-Kocul oilfield reactivations, installation of additional jet pumps in the
Cakran-Mollaj oilfield and optimizing equipment performance. As a result, the Company’s average net
production capacity was approximately 2,100 boed (approximately 2,760 average gross boed) at the end
of March 2013. The Company has shown peak production capacity of 3,100 gross boed which requires
both operational and infrastructure upgrades to be completed as part of the 2013 program