Post by
BruleShore on Mar 25, 2018 4:41pm
Fifteen Mile Stream and Cochrane Hill
On page 17 and 18 of AGB’s March 2018 presentation, the drill hole plans for FMS and CH are shown.
For FMS, the outline of the current defined M&I is in orange to the right of the page. It contains 100 drill holes with a M&I footprint of 431,000 oz. Au.
The area OUTSIDE the original defined space has over 300 drill holes, the last of which were finished this month.I assume they weren’t drilling these holes for practice.
Similarly, on page 18, the current drilled holes for Cochrane Hill are shown. Again, the current M&I area has about 100 holes and 393,000 oz. Au. The area OUTSIDE the original defined space has 145 drilled holes.
Would you dare to think that the recently completed Phase3 drill program could show M&I surpassing the original 825,000 oz.Au?
Idle, you know mining protocol. How long before Phase 3 results will be known? Will they all be released at once? Or piecemeal?
Second question..Measured and Inferred (M&I)... how accurate are these numbers generally?