Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum KLONDEX MINES LTD. T.KDX

"Klondex Mines Ltd is a gold and silver producer engaged in exploration, development, and production of its properties. The company has interests in three mineral properties: the Fire Creek Mine, and the Midas Mine and ore milling facility, both of which are located in the state of Nevada, USA, and the True North Gold Mine (formerly the Rice Lake Mine) and mill in Manitoba, Canada. The revenue... see more

TSX:KDX - Post Discussion

KLONDEX MINES LTD. > News - Drill results and earnings date
View:
Post by Loonee on Jan 25, 2018 5:32pm

News - Drill results and earnings date

great drill results!

[url=https://www.stockwatch.com/News/Item.aspx?bid=Z-C%3aKDX-2561655&symbol=KDX®ion=C]news[/url]Klondex Mines drills 10.7m of 56.65g/t Au at Fire Creek

2018-01-25 16:41 ET - News Release

Mr. Brian Morris reports

KLONDEX CONTINUES TO EXTEND HIGH GRADE MINERALIZATION AT FIRE CREEK'S ZEUS TARGET, INCLUDING 1.65 OPT AU OVER 35.0 FT; COMPANY SCHEDULES ANNOUNCEMENT OF 2017 OPERATING RESULTS AND 2018 GUIDANCE

Klondex Mines Ltd. has provided the final results of the 2017 surface exploration drill program on the Zeus target at its Fire Creek mine located in northern Nevada, United States.

Surface Exploration Drilling Highlights: (TABLE 1)

 

  • FCC-0095: 1.65 opt Au over 35.0 ft, or 56.65 g/t over 10.7 m
    • Including 16.05 opt Au over 2.3 ft, or 550.3 g/t over 0.7 m
    • Including 6.52 opt Au over 1.2 ft, or 223.41 g/t over 0.4 and 0.41 opt Au over 3.4 ft, or 13.95 g/t over 1.0 m
  • FCC-0097: 0.14 opt Au over 15.8 ft, or 4.75 g/t over 4.8 m
  • FCC-0107: 0.16 opt Au over 15.0 ft, or 5.57 g/t over 4.6 m

 

Surface Exploration Drill Summary: (FIGURE 1)

Seven surface holes were drilled in 2017 totaling 9,868.5 ft (3,007.9 m). The final results from the last four holes of the drill program were recently received. The focus of this drill program was to infill and step out from last year's drilling with the intent to develop a resource within this mineralized structural corridor. Klondex expects to release an updated resource estimate for Nevada operations during the first quarter of 2018.

Surface Exploration Drilling Key Points: (FIGURES 2 and 3)

This surface exploration drill program builds on results previously released in 2017 (reported in a press release dated November 15, 2017) and the 2016 exploration program which successfully tested a north-south geophysical anomaly located about 4,000 ft (1,219 m) northwest of the current mine workings. This drilling has identified a zone of high grade mineralization within the Zeus structural corridor, approximately 900 ft (274 m) in length and 400 ft (122 m) vertical. This high grade zone is within 400 ft (122 m) of surface and is open in all directions. Additional drilling is scheduled in 2018 as Klondex expects to continue to infill and extend this significant high grade mineralization.

Mr. Brian Morris, Senior Vice President, Exploration, said, "The final 2017 drill results continue to support the tremendous potential to expand the high grade resource in the Fire Creek District." Mr. Morris elaborated, "In addition, we are seeing evidence of a halo of lower grade mineralization outside the high grade structures, similar to the Fire Creek open pit resource. Moreover, geophysics suggest that Zeus is part of a major 6,500 ft (1,981.2 m) structural corridor which we plan to continue to define along strike in 2018."

2017 Operating Results and 2018 Guidance

Klondex will provide 2017 operating results and 2018 guidance metrics before the United States and Canada financial markets open on Wednesday, February 7, 2018. The Company will further discuss this information during its Investor Day meeting to take place the same day at 9:00 am Eastern Standard Time.

Assays were performed by American Assay Laboratories of Sparks, Nevada, as directed under the supervision of Klondex staff. This organization is an ISO 17025 accredited independent laboratory.

A description of the data verification methods, quality assurance program and quality control measures applied can be found in the technical report titled "Technical Report for the Fire Creek Project, Lander County, Nevada", dated March 28, 2016 and with an effective date of June 30, 2015 which is available under the Company's issuer profile on SEDAR at www.sedar.com and on EDGAR at www.sec.gov .

Be the first to comment on this post
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities