Post by
tamaracktop on Sep 01, 2022 8:43am
Thinkbig has posted 14 times on Xevec's board in 1 day
September 27:
"The first plant, which will be built after securing a contract to process dross residues, has already been identified within the Gulf Region and discussions to secure and process those residues have already taken place. This facility is expected to be designed to process approximately 25,000 tonnes of aluminum dross residues per year and convert these aluminum dross residues into high margin products with an expected selling price of between USD$200 to $450 per tonne."
25,000 tonnes @$200-$450 is $5 million to $11.5 million. Gross Revenues, not profit
It's a 50/50 jv, and its not going to happen today
I wouldn't get overly excited
The company needs money yesterday
Comment by
Gottofly on Sep 01, 2022 9:25am
Debbie downer Tamarack! Who invited you to the party? I'm sticking with this game changer. The volatility has been great for my share count. Golden rule of investing in new tech, don't bet the kitchen sink and volatility and timeframe disruptions can be absorbed without additional Grey hair.
Comment by
developbc on Sep 01, 2022 3:38pm
Xebec Adsorption Inc T.XBC Thanks thinkbigsti69 for showing the same love bash over at Xebec that Tamara shows up here Long and strong PYROGENESIS
Comment by
Thinkbigsti69 on Sep 01, 2022 3:42pm
xevec is the medication that tamaracktop should be taking to stop him from making a fool of himself. I tried to convince him to take a mega dose but he prefers to be stockhouse's resident fool.