Comment by
Asdfghjk on Dec 28, 2023 10:38am
Take it from some random guy on a bb.
Comment by
AlwaysLong683 on Dec 29, 2023 7:39am
SKE's Eskay Creek is also a brownfield project with lots of infrastructure already in place and its FS pegs initial pre-production CAPEX at $713M CAD. I think TLG's FS will come in at least $700M CAD - probably significantly more ($800M +...?).
Comment by
metalhead666 on Dec 29, 2023 7:53am
TLG has significantly more infrastructure in place. The power line and sub station, a camp, a pit already dug, a water treatment plant. Time will tell but I'll bet it's significantly less than what SKE is modeling
Comment by
AlwaysLong683 on Dec 29, 2023 8:12am
Possible, but I'll stick with TLG coming in at the higher initial CAPEX estimate. SKE's Inherited Infrastructure Summary - pages 5 and 13. TLG's Inherited Infrastructure Summary - page 28.