https://www.malcysblog.com/2024/11/oil-price-savannah-touchstone-challenger/ Touchstone Exploration
Touchstone has announced initial production from the Cascadura C well pad.
Touchstone has safely commissioned the flowline connecting our Cascadura C surface location to the Cascadura natural gas processing plant, which ties in our Cascadura-2ST1 and Cascadura-3ST1 wells. Additionally, a new natural gas separator has been installed and brought online, expanding the plant’s gross natural gas processing capacity to approximately 140 million cubic feet per day.
We are currently conducting production testing operations on the Cascadura-2ST1 well and expect to advance to the Cascadura-3ST1 well thereafter. Isochronal tests will be performed on both wells to evaluate their production capacity and refine future production models. These tests involve flowing each well at various choke sizes to measure flow rates and pressures, followed by pressure buildup periods to assess reservoir performance. During this testing phase, all produced gas will be processed and sold. We expect to complete testing operations within the next two weeks, after which both the Cascadura-2ST1 and Cascadura-3ST1 wells will enter continuous production. Touchstone will provide additional flow rate details once testing concludes.
Paul R. Baay, President and Chief Executive Officer, commented:
“We are excited to announce the commencement of production from the Cascadura C pad, marking a significant milestone as tested volumes from these wells begin generating revenue. Following these well tests, our focus will be on determining optimal production levels to maximize recovery from this portion of the structure. Positioned at the boundary of our reserves booking, these wells offer an exciting opportunity to expand our reserves potential across the field as we continue to evaluate the Cascadura structure to the east.
With the recent flowline installation and facility expansions, we have established strategic infrastructure throughout the Cascadura field, creating efficiencies that are expected to greatly reduce future cycle times from drilling to production.“
This is exceptionally good news for Touchstone and its shareholders who have waited patiently for this next significant move at Cascadura which has now been connected and is producing. TXP will do production tests on Cascadura-2ST1 and Cascadura-3ST1 to identify potential capacity and refine production and reservoir models.
Additionally, a new natural gas separator has been installed and brought online, expanding the plant’s gross natural gas processing capacity to approximately 140 million cubic feet per day which will mean considerable revenue and as CEO Paul Baay says, ‘a significant milestone’.
A recent visit to Trinidad enabled a group of analysts a chance to see not only the upgraded facilities but the uniquely strong team of people on site making things happen. Expect a few updates as the facility, including the new gas separator which will deliver the increased production after testing in the next few days.
I expect that as the Touchstone management carefully deliver Cascadura to its peak performance the share price value will start to go to that which I had previously predicted at the beginning of this year. As further news comes to the market I plan to add to the notes I wrote about on my recent visit, this is a very positive story indeed.
.
GLTA !