IMO, The copper sulphides seen through out core prove the graben concept at depth..The gap between the the sulphides seen here, from surface down to 52m , nil cu. Next a 4m gap between 54m and 58m. A 12 m gap between 60m and 72m. . A 18m gap between 86m and 104m. A 15m gap between 115 and 130m. A 40m gap between 133 and 170m . A 20m gap between 172m and 192m. A 5m gap between 196m and 201m..A 20m gap between 205m and 224..A 25m gap between 226. A and 250m,,A 35m gap between 251 and 286 m..
IMO. The gaps between sulphides adds to the strip ratio cost of removing this over burden . The copper grades here seeing a true with off core of 60 % means the cut-offf grade of .38 % for profit may not be profitable ..in this core..hole 2..
Just my opinion,
Let The Drills Be Our Friends
Traps7
Details for the 2024 deep diamond drill holes at the Storm Project. Note*, drill hole ST24-03 is pending and will be completed during 2025.
Hole ID | From (m) | To (m) | Width | Cu ppm | Zn ppm | Ag g/t |
ST24-02 | 52.00 | 55.00 | 3.00 | 1402 | 10 | 2.0 |
Including | 53.00 | 53.60 | 0.60 | 6100 | 10 | 2.0 |
| 58.00 | 59.60 | 1.60 | 110 | 10 | 2.0 |
| 72.50 | 76.50 | 4.00 | 203 | 10 | 1.1 |
| 77.00 | 79.00 | 2.00 | 953 | 10 | 1.8 |
Including | 78.00 | 78.50 | 0.50 | 3050 | 10 | 2.0 |
| 81.00 | 84.00 | 3.00 | 140 | 10 | 1.3 |
| 85.00 | 86.50 | 1.50 | 253 | 10 | 1.0 |
| 104.00 | 106.00 | 2.00 | 420 | 10 | 1.5 |
| 107.00 | 112.10 | 5.10 | 176 | 10 | 0.9 |
| 114.50 | 115.00 | 0.50 | 640 | 10 | 2.0 |
| 130.30 | 131.00 | 0.70 | 230 | 10 | 1.0 |
| 132.50 | 133.10 | 0.60 | 270 | 10 | 2.0 |
| 170.00 | 172.00 | 2.00 | 195 | 10 | 1.5 |
| 193.00 | 194.50 | 1.50 | 240 | 10 | 2.0 |
| 195.50 | 196.50 | 1.00 | 2290 | 40 | 1.5 |
Including | 195.50 | 196.00 | 0.50 | 4330 | 60 | 2.0 |
| 201.00 | 202.00 | 1.00 | 220 | 30 | 1.0 |
| 203.50 | 205.00 | 1.50 | 207 | 10 | 1.3 |
| 224.00 | 226.00 | 2.00 | 150 | 10 | 1.0 |
| 250.00 | 251.00 | 1.00 | 140 | 10 | 1.0 |
| 286.00 | 287.50 | 1.50 | 317 | 17 | 1.3 |
| 289.50 | 290.50 | 1.00 | 620 | 10 | 1.3 |
| 292.00 | 300.00 | 8.00 | 256 | 10 | 0.8 |
| 300.50 | 301.50 | 1.00 | 200 | 10 | 1.0 |
| 302.00 | 304.00 | 2.00 | 900 | 15 | 2.0 |
Including | 303.00 | 303.50 | 0.50 | 2560 | 10 | 2.0 |
| 305.00 | 308.00 | 3.00 | 745 | 10 | 1.3 |
Including | 306.50 | 307.00 | 0.50 | 1170 | 10 | 0.5 |
| 310.00 | 316.00 | 6.00 | 935 | 10 | 1.0 |
Including | 311.00 | 311.50 | 0.50 | 1140 | 10 | 2.0 |
And | 313.50 | 314.50 | 1.00 | 3270 | 10 | 0.8 |
| 317.00 | 324.00 | 7.00 | 1628 | 11 | 0.9 |
Including | 322.50 | 323.50 | 1.00 | 5295 | 15 | 0.8 |
| 327.50 | 328.00 | 0.50 | 210 | 10 | 1.0 |
| 330.00 | 333.00 | 3.00 | 110 | 10 | 1.3 |
| 348.00 | 349.00 | 1.00 | 120 | 10 | 2.0 |
| 352.00 | 353.00 | 1.00 | 110 | 10 | 1.0 |
| 366.00 | 367.00 | 1.00 | 110 | 10 | 3.0 |
| 369.00 | 370.00 | 1.00 | 140 | 10 | 1.0 |
| 373.00 | 375.00 | 2.00 | 160 | 10 | 1.0 |
| 377.00 | 380.00 | 3.00 | 110 | 10 | 1.3 |
| 381.00 | 388.00 | 7.00 | 140 | 13 | 1.2 |
| 397.00 | 398.00 | 1.00 | 110 | 10 | 1.0 |
| 399.00 | 401.00 | 2.00 | 105 | 10 | 0.8 |
| 409.60 | 418.00 | 8.40 | 388 | 10 | 1.6 |
Including | 413.00 | 413.35 | 0.35 | 1640 | 10 | 2.0 |
| 421.00 | 424.65 | 3.65 | 542 | 10 | 1.8 |
Including | 422.00 | 423.00 | 1.00 | 1280 | 10 | 2.0 |
ST24-03 | 10.00 | 11.00 | 1.00 | 100 | 20 | 0.5 |
| 24.00 | 26.00 | 2.00 | 135 | 30 | 1.0 |
| 33.00 | 34.00 | 1.00 | 100 | 10 | 0.5 |
| 35.00 | 40.00 | 5.00 | 208 | 10 | 0.7 |
| 41.00 | 42.00 | 1.00 | 120 | 10 | 1.0 |
| 43.00 | 49.00 | 6.00 | 125 | 33 | 1.0 |
| 54.00 | 55.00 | 1.00 | 110 | 10 | 0.5 |
| 56.00 | 57.00 | 1.00 | 590 | 10 | 1.0 |
| 66.00 | 70.00 | 4.00 | 153 | 20 | 0.9 |
| 90.00 | 91.00 | 1.00 | 100 | 10 | 0.5 |
| 96.00 | 97.00 | 1.00 | 120 | 10 | 0.5 |
| 108.00 | 119.00 | 11.00 | 298 | 255 | 0.6 |
| 120.00 | 129.07 | 9.07 | 175 | 182 | 0.5 |
| 130.90 | 133.00 | 2.10 | 105 | 45 | 0.5 |
| 152.00 | 153.98 | 1.98 | 150 | 10 | 0.5 |
| 178.70 | 179.00 | 0.30 | 1900 | 80 | 15.0 |
| 180.04 | 180.82 | 0.78 | 170 | 10 | 2.0 |
Table 2: Summary of recent significant drilling intersections for drill holes ST24-02 and ST24-03. Given the exploratory nature of the drilling a cut-off of 0.01% Cu is used to highlight the presence of copper sulfides. In the absence of copper sulfide or oxides, the dolomite host rocks at Storm typically contain 10-25ppm copper. Diamond drill intersections are all core length and true width is expected to be 60% to 100% of core length