Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Bullboard - Stock Discussion Forum Bayhorse Silver Inc V.BHS

Alternate Symbol(s):  BHSIF

Bayhorse Silver Inc. is a junior natural resource company, which is engaged in the acquisition, exploration and development of natural resource properties. The Company has a 100% interest in the Bayhorse Silver Mine, Oregon United States of America. The Bayhorse Silver Mine and the Pegasus Project are 44 kilometers (km) southwest of Hercules Metals’ porphyry copper discovery. The Company also... see more

TSXV:BHS - Post Discussion

View:
Post by NoRetire on Oct 07, 2021 12:06pm

News

Vancouver, British Columbia--(Newsfile Corp. - October 7, 2021) - Bayhorse Silver Inc. (TSXV: BHS) (OTCQB: BHSIF) (FSE: 7KXN) (the "Company" or "Bayhorse") has received the building permit to install its full flotation processing facility in Payette, Idaho. The facility is 40 miles on mostly Interstate 84, from the Bayhorse Silver Mine in Oregon, USA.

The full flotation facility , where building erection is now 75% completed, is capable of handling 75 tons of pre-processed, ore-sorted, mineralization from the Bayhorse Mine per day.

The Company anticipates that it will have the equipment relocated to the new facility and back in operation by mid November.

The Company has fully completed lease and buyout payments on its US$1 million Steinert Ore-Sorter, that is capable of a 40 ton per hour throughput and now holds full title to the equipment.

During this past six months of nearly continuous operation, the Company is pleased to report that the grade of the rejected material from the Ore-Sorter has consistently been less than ½ ounce (15 grams) per ton of silver, demonstrating that it is achieving maximum recovery with minimal loss.

Operations at the Bayhorse Mine currently consists of drifting into and making safe the high grade Big Dog zone, where additional drilling of the Big Dog structure is under way,. This is to determine the dip, strike, and plunge and width of the zone, to permit extraction of mineralized material from this high grade zone.

Recent sampling of the smaller veins criss-crossing this zone has identified these veins are coated with limonite. These very high grade veins are very brittle and fracture and liberate readily into small pieces on blasting .

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5015/98900_a5bbfe8fb46ac986_001.jpg

Figure 1 High grade vein, Big Dog stope

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/5015/98900_a5bbfe8fb46ac986_001full.jpg.

The Company has made some changes to the initial crushing circuit to screen off all ½ inch material, that will bypass the Ore-Sorter and go straight to the flotation mill.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5015/98900_a5bbfe8fb46ac986_002.jpg

Figure 2 XRF reading of 2328.2 silver

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/5015/98900_a5bbfe8fb46ac986_002full.jpg.

A number of mineralized samples from these newly accessible veins were measured with XRF by the Company's geologists (Apex Geoscience) one of which measured 2328.2 g/t (74.85 opt) silver, as well as 17.16% copper, 2.04% cobalt and 26.74% zinc, and 4.99% antimony. Another sample graded 1,350 g/t (The two samples were submitted to Christopherson Umpire Assayers of Kellogg, Idaho for silver assay, (fa/grav) and returned 75.82 opt (2,358.2 g/t) and 40.4 opt (1,256.5 g/t) respectively.

XRF devices are used by the Company inside the mine and on drill core to identify and initially assess the mineralized areas. The Company cautions that while the XRF device is calibrated, and the assay samples generally agreed with the XRF readings, the samples are not representative of actual mining grades as they only measure a 1cm portion of the actual sample.

The Company is not basing any decision to produce on a feasibility study of mineral reserves demonstrating economic and technical viability and advises there is an increased uncertainty and specific economic and technical risk of failure with any production decision. These risks include, but are not limited to, (i) a drop in price of commodities produced, namely silver, copper, lead and zinc, from the pricing used to make a production decision; (ii) failure of grades of the produced material to fall within the parameters used to make the production decision; (iii) an increase in mining costs due to changes within the mine during development and mining procedures; and (iv) metallurgical recovery changes that cannot be anticipated at the time of production.

The TSX Venture Exchange, has approved a $166,685.42 settlement for debt amount of convertible debenture accrued interest through the issuance of 1,515,322 common shares of the Company at a price of $0.11 per share. In accordance with the TSX Venture Exchange rules, the shares issued are subject to a hold period of four months plus a day from the date of issuance.

This News Release has been prepared on behalf of the Bayhorse Silver Inc. Board of Directors, which accepts full responsibility for its contents. Dr. Stewart Jackson, P.Geo., a Qualified Person and Consultant to the Company has prepared, supervised the preparation of, and approved the technical content of this press release.

Comment by mlyoneday on Oct 07, 2021 12:12pm
See.... all you have to do is ask.
Comment by sage4050 on Oct 07, 2021 12:23pm
Wish you would have asked about Ocean and cash flow.  Payette and high grades are not only expected but almost seem like old news.  Drilling and mining for MONTHS and all they can report is paid the sorter off and grades are ok. Is this the news we have all been waiting months for?
Comment by NoRetire on Oct 07, 2021 12:28pm
Now, will the SP move is the question
Comment by sage4050 on Oct 07, 2021 12:53pm
Not the news everyone wants to see.  Nice to have sorter paid for and Payette approved.  But cannot get the tons down.  Now they say can do 75 tons a day at Payette I thought it was 200 tons.  Over at CEO.CA they really like the news.  Hope we get some movement without really telling us much.  Make another call DAY.
Comment by sage4050 on Oct 07, 2021 1:16pm
So if that is it DAY. G didn't really tell you much.  Cannot understand all the excitement.  Write a list of IMPORTANT questions before you call again and see what you come up with.  Good Luck and Giddy-Yap.
Comment by mlyoneday on Oct 07, 2021 1:20pm
One thing at a time sage. Trust me I've been here for ten years with bayhorse shares, always waiting. But I know things will work.out. can't be in this for a get rich over night deal. G is doing his thing. Be happy with what you own.
Comment by sage4050 on Oct 07, 2021 2:39pm
G's thing is KINK CITY.  ALWAYS ONE MORE THING.  If you have been here for 10 years you should know this.  G has had enough time and even the whales here should start facing the truth and admit it.
Comment by HurricaneAmanda on Oct 07, 2021 2:58pm
Or you could, you know, write a list of questions and call him yourself.
Comment by mlyoneday on Oct 07, 2021 3:01pm
Haha. Exactly.
Comment by sage4050 on Oct 07, 2021 3:14pm
I do not know how many times I must say it after all these years.  I would not call G for all the tea in China.  I have lost money with this guy and his endless excuses from day one and do not want to listen to another one.  
Comment by globetrotter0sa on Oct 08, 2021 7:45am
enough is enough! This is the first time after 3,5 years that I will post here again - and also the last time. Sage4050: Please keep playing in your sandpit or do your homework. You have already expelled enough experts from this board. Your constant refusal to dig into the basics of stock trading and the constant evasion of putting you on "ignore" will not improve the quality of this ...more  
Comment by sage4050 on Oct 08, 2021 8:25am
Cobstant adoration of BHS is just as sickening.  All I get out of your post is the train is about to leave.  How many times to I have to hear that.  A little bellyaching never hurt anybody.  Grow a pair. 
Comment by wanderer9641 on Oct 07, 2021 3:55pm
Sage - take time to think on this - from the news release - The full flotation facility , where building erection is now 75% completed, is capable of handling 75 tons of pre-processed, ore-sorted, mineralization from the Bayhorse Mine per day.  - break it down and think on what it means - 75 tons after sorter.  Get thinking Sage.
Comment by wanderer9641 on Oct 07, 2021 3:57pm
Do not assume full use - at 95% reduction with the sorter you would need a massive amount out of the mine. Hoping for even better grades and lower rejection rates.
Comment by sage4050 on Oct 07, 2021 9:02pm
All those pics of mine walls certainly looked like better grades.  
Comment by sage4050 on Oct 07, 2021 9:11pm
Hope we do not have to wait until silveR goes back up.  We were told eons ago that G was profitable at 18.00 and many here thought G was beating the bushes for a  deal.  If G is waiting for silver to go to 29 or 30 he will probably lose the Ocean contract and need much more financing.  Maybe I should call G, do you think/
Comment by miner23 on Oct 07, 2021 10:03pm
Go for it Sage.