Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum Channel Resources Ltd V.CHU

TSXV:CHU - Post Discussion

Channel Resources Ltd > Channel drills 108 m of 1.1 g/t Au at Mankarga 5
View:
Post by TSXPLAYER1 on Sep 14, 2011 9:47am

Channel drills 108 m of 1.1 g/t Au at Mankarga 5

Channel drills 108 m of 1.1 g/t Au at Mankarga 5

Channel Resources Ltd (C:CHU)
Shares Issued 89,440,911
Last Close 9/13/2011
.28
Wednesday September 14 2011 - News Release

Mr. Colin McAleenan reports

CHANNEL RESOURCES REPORTS RESULTS FROM CORE DRILLING PROGRAM ON MANKARGA 5 DEPOSIT AT TANLOUKA GOLD PROJECT, BURKINA FASO

Channel Resources Ltd. has released initial assay results from a 15,000-metre core definition drilling program undertaken on the Mankarga 5 gold deposit at the Tanlouka gold project in Burkina Faso, West Africa.

This first program of core drilling at Tanlouka has been designed to follow-up on 7,100 metres of reverse circulation ("RC") drilling in 57 holes on the Mankarga 5 structure that comprised the bulk of a 10,000 metre RC drilling program completed earlier in the year. Drilling completed in RC programs to-date at Mankarga 5 has delineated a 1,850 metre long and up to 200 metre wide, northeast trending mineralized zone that remains open along strike in both directions and to-depth.

The main objectives of the ongoing core drilling program are to provide geological and structural context for the deposit, to further expand the zone and to support the deposit's first resource estimate, which is expected to be completed in the first quarter of 2012. To-date a total of 7180 metres in 32 core holes have been drilled in this program. Available assay results from an aggregate of 1,764.5 metres of core from 8 holes are presented below in order of their location on the Mankarga 5 grid, and can be viewed on a drill hole location map presented on the Company's website. Please refer to Channel's drilling, sampling and assay reporting practices below for further information on how these results are reported.

                                                                   Weighted                                                         Interval   average                                          From      To  Intercept     gradeHole No.                                    (m)     (m)       (m)  (g/t Au)                                                           Tan11-DD17                                59.0   129.0       70.0      1.99Includes                                  68.0    81.5       13.5      6.47                                         161.5   164.5        3.0      1.69Tan11-DD01                                 0.0    64.0       64.0      0.41                                          69.3   168.0       98.7      0.92Includes                                 110.0   140.0       30.0      1.15And                                      146.0   158.0       12.0      1.94Includes                                 149.5   150.0        0.5     14.90Tan11-DD02                                32.0   140.0      108.0      1.10Includes                                  40.0    60.0       20.0      2.32(twin of Tan11-RC39)                      65.8    90.0       24.2      1.81                                         146.0   196.0       50.0      0.43Includes                                 158.3   159.0        0.7      7.86                                         202.0   213.0       11.0      0.38                                         219.4   238.0       18.6      0.78Includes                                 219.4   228.0        8.6      1.20Tan11-DD03                                 9.0    61.5       52.5      1.20Includes                                  36.0    40.5        4.5      5.67Includes                                  39.0    40.5        1.5     15.10And                                       60.0    61.5        1.5     11.70                                         111.0   177.0       66.0      0.64Includes                                 144.2   145.0        0.8      8.20And                                      152.2   168.0       15.8      1.64Tan11-DD05                                 6.0    75.0       69.0      0.63Includes                                  12.0    19.5        7.5      2.08(twin of Tan10-RC22)                      40.8    45.0        4.2      1.08And                                       61.5    63.0        1.5      5.32                                          80.0   107.0       27.0      0.32                                         114.5   128.4       13.9      0.23                                         131.4   150.5       19.1      0.41                                         166.8   176.2        9.4      0.24                                         200.2   207.8        7.6      5.35                                         205.5   207.0        1.5     25.30Tan11-DD04                                64.5    70.5        6.0      0.21                                         103.3   106.8        3.5      0.37                                         115.5   180.0       64.5      0.77Includes                                 119.0   130.3       11.3      1.32And                                      161.2   166.5        5.3      2.24                                         184.0   195.0       11.0      2.73Includes                                 184.9   186.0        1.1      24.6                                         203.5   250.0       46.5      0.84Includes                                 210.5   211.0        0.5     43.60Tan11-DD07                                 0.0    42.0       42.0      0.53Includes                                   4.5    12.0        7.5      1.19                                          69.0    90.0       21.0      0.59Includes                                  84.0    87.0        3.0      1.41                                          97.5   106.0        8.5      0.91                                         120.0   127.5        7.5      0.54                                         138.0   178.5       40.5      0.55Includes                                 156.0   163.5        7.5      1.10Tan11-DD06                                 1.5     9.5        8.0      0.58                                          13.5    21.0        7.5      0.99                                          24.0    78.0       54.0      0.70Includes                                  43.0    44.8        1.8      6.03                                         111.8   121.5        9.7      0.24                                         126.0   148.5       22.5      0.25

The drill core has provided much more information on the structure of mineralization at Mankarga 5 than was available from cuttings produced from RC holes. Measurements of structural angles and correlations from several cross sections indicate that the mineralized zone dips steeply to the northwest rather than steeply to the southeast as previously thought. In order to provide better angles of intersection with the mineralized zone, the orientation for the majority of holes being drilled on the deposit will now be inclined at -50 degrees to the southeast i.e. in the opposite direction to most of the previously drilled holes.

Hole Tan11-DD01 Tan11-DD03 and Tan11-DD006, each with an azimuth of 120 degrees, are inclined at opposing angles, or "scissored", to other holes on their respective sections, which are inclined to an azimuth of 300 degrees. Correlations between the scissored holes and previously drilled RC holes indicate horizontal widths of the mineralized zone ranging from approximately 150 to 200 metres from section 450NE to 750NE, with mineralization extending to at least 170 metres below surface on section 450NE. The strongest mineralization and a sharp limit to the mineralization is demonstrated on the southeastern (footwall) side of the zone on sections 450NE, 650NE and 800SW.

Assay laboratories in Burkina Faso are experiencing a significant backlog of samples due to the large amount of exploration activity underway throughout the country and hence processing times for results have slowed.

Comparison of Twinned Holes

Several holes have been planned in the current core drilling program to 'twin' previously reported RC holes in order to compare grades of mineralized intercepts between the two drilling methods. Three drill holes presented above, Tan11-DD02, Tan11-DD05 and Tan11-DD17 are twins of RC holes Tan11-RC39, Tan10-RC22 and Tan11-RC72 respectively and the grades of matching intervals are compared below.

---------------------------------------------------------------------------                                                                                                               Weighted                                                        Average   Variance                          Interval (metres)   Intercept     Grade   DD vs RC Hole Number                 From      To      (metres)  (g/t Au)        (%)---------------------------------------------------------------------------                                                                           ---------------------------------------------------------------------------Tan11-DD02                  32.0   134.0        102.0      1.16      -23.6 ---------------------------------------------------------------          Tan11-RC39                  26.0   128.0        102.0      1.52          ---------------------------------------------------------------------------                                                                           ---------------------------------------------------------------------------Tan11-DD05                   6.0    37.5         31.5      0.68     +119.3---------------------------------------------------------------          Tan10-RC22                   6.0    38.0         32.0      0.31          ---------------------------------------------------------------------------                                                                           ---------------------------------------------------------------------------Tan11-DD05                  40.8   121.2         80.4      0.41      +17.1 ---------------------------------------------------------------         Tan10-RC22                  42.0   122.0         80.0      0.35          ---------------------------------------------------------------------------                                                                           ---------------------------------------------------------------------------Tan11-DD05                 139.4   145.5          6.1      0.41       +2.5---------------------------------------------------------------          Tan10-RC22                 140.0   146.0          6.0      0.40          ---------------------------------------------------------------------------                                                                           ---------------------------------------------------------------------------Tan11-DD05                 165.4   187.5         22.1      0.17      +54.5 ---------------------------------------------------------------         Tan10-RC22                 166.0   188.0         22.0      0.11          ---------------------------------------------------------------------------                                                                           ---------------------------------------------------------------------------Tan11-DD17                  59.0   119.5         60.5      2.07      +80.0 ---------------------------------------------------------------          Tan11-RC72                  42.0   102.0         60.0      1.15          ---------------------------------------------------------------------------

Hole Tan11-DD02 was collared 3 metres behind Tan11-RC39 and twins the reverse circulation hole for the first 150 metres of its length. This is the only set of twins examined to date that indicates a higher grade in the RC hole than in the diamond hole.

Hole Tan11-DD05 was collared very close to Tan10-RC22 on section 550NE and twins the reverse circulation hole for its entire length. This direct comparison of lower grade intersections indicates consistenty higher grades from drill core relative to RC derived samples.

Hole Tan11-DD17 was collared five metres behind TAN11-RC72 on section 800SW and encountered the mineralized zone at 59 meters down-hole versus 42 meters in the RC hole. The core hole then intersected 70 meters of mineralization in the main zone compared with 60 metres in the RC hole. To achieve as direct a comparison as possible, grades from the first 60 meters of the mineralized zone in the core hole were compared with the entire mineralized intersection in the RC hole and indicates an 80% increase in the grade of the core hole over that in the RC hole.

"Channel's confidence in the consistency of mineralization in the Mankarga 5 zone continues to grow," commented Colin McAleenan, President and CEO of Channel Resources. "The Company is rapidly enhancing its understanding of the deposit's structure ahead of the project's first resource estimate, expected in the first quarter of 2012. It is especially encouraging to see drill core results from section 800SW, the furthest section to the southwest for which drill results are available, showing higher grades than RC holes previously drilled on that line. Two holes have now been drilled, with results pending, up to 500 metres further to the southwest of this section in an effort to extend the currently delineated 1.85km strike-length of the deposit."

Channel Resources Ltd. maintains a rigorous quality control program involving the use of duplicate samples and blanks and certified gold standards from an accredited Canadian laboratory in every batch of 20 samples. Core samples are assayed using standard fire assay techniques on a 50 gram charge with an atomic absorption finish by SGS Burkina Faso SA in Ouagadougou, Burkina Faso. RC samples discussed in this release were assayed using the same methods at Abilab Burkina SARL (ALS Laboratory Group) in Ouagadougou. The drilling program is supervised by John Adams, P.Geo., a qualified person as defined by NI 43-101, who has reviewed the contents of this news release.

Drilling, sampling and reporting practices:

--  All hole collars are set to dip at -50 degrees  to their respective    azimuths. --  RC holes are systematically sampled at 2m intervals. --  Core holes are sampled geologically with a maximum sample interval of    1.5m (with the exception of holes Tan11-DD01 and Tan11-DD02 which have a    maximum sample interval of 2.0m). --  "Mineralized rock" is defined as rock with a grade of over 0.10 g/t Au. --  "Significant assay results" is defined as samples, or series of    consecutive samples, with grade thickness (i.e. weighted average gold    grades multiplied by their intervals), of greater than 1.0. --  The amount of internal waste (i.e. with a grade of less than 0.10 g/t    Au) included in a reported mineralized interval does not exceed 10%. --  No top cut has been applied to the individual grades before weighted    average grades have been calculated. --  Unless otherwise stated, reported intersections are downhole lengths.    True widths, other than as estimated on each section, shall be    determined once geological modeling of the zone has been completed. 

We seek Safe Harbor.

Comment by teevee on Sep 15, 2011 10:27am
Good news. Provided the price of gold stays up, and continued good results, taking into account the usual discount to market, CHU should be able to finance again above $.20/share. 
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities