Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Price History  |  Ratios  |  Insiders

Central Iron Ore Ltd V.CIO

Central Iron Ore Limited, together with its subsidiaries, engages in the exploration and development of gold projects and precious minerals in Western Australia. It holds 100% interest in the South Darlot Gold Project covering an area of 324 square kilometers located in Kalgoorlie in Western Australia. The company was formerly known as International Gold Mining Limited and changed its name to Central Iron Ore Limited in January 2010. Central Iron Ore Limited is headquartered in Sydney, Australia. Central Iron Ore Limited is a subsidiary of Gullewa Limited.


TSXV:CIO - Post by User

User Avatar Image
(2269)
•••
  • Betteryear2X
Post by Betteryear2on Feb 14, 2023 1:28pm
378 Views
Post# 35285627

South Darlot Gold Project CIO – TSX.V

South Darlot Gold Project CIO – TSX.V

VANCOUVER, British Columbia, Feb. 14, 2023 (GLOBE NEWSWIRE) -- Central Iron Ore Ltd. (CIO – TSX.V) (“CIO” or “the Company”) is pleased to announce results from the December 2022 RC drilling programme at its Endeavour prospect at the South Darlot Gold Project.

Mermaid Highlights

  • 22ENRC014:        5 meters @ 11.93 g/t Au from 66 metres; including 1m @ 38.8 g/t Au
     
  • 22ENRC015:        1 meter @ 12.00 g/t Au from 74 metres
     
  • 22ENRC017:        6 meters @ 49.30 g/t Au from 42 metres; including 2m @ 116 g/t Au
     
  • 22ENRC018:        3 meters @ 4.20 g/t Au from 13 metres
     

Endeavour RC Drilling

CIO completed an 18-hole RC drilling programme for 1,060 metres at the Endeavour prospect from 24th of November to the 2nd of December 2022 on mining licence M 37/631. The programme was designed to test for mineralised extensions down dip and to the immediate west of the Endeavour deposit, with a further two holes drilled within the known resource to obtain samples for metallurgical test work.

Gold mineralisation at Endeavour is associated within a 1 to 2 meter (Figure 1 & Figure 2) wide laminated quartz vein, the Endeavour Vein, which contains minor accessory sulphides including pyrite and traces of galena, sphalerite and chalcopyrite. The vein is hosted within an intermediate volcanic sequence. A super-high-grade domain exists at vertical depths of between 20 to 45 meters. At this depth there is a sharp, 5 to 10-fold increase in gold metal coinciding with the transition from complete to partial oxidation of the host rock. In this domain, iron oxides and traces of chalcocite and covellite also exist.

South Darlot Gold Project: Endeavour RC Drilling Programme (globenewswire.com)

 

 

<< Previous
Bullboard Posts
Next >>
Dealroom for high-potential pre-IPO opportunities