TSXV:KALO - Post Discussion
Post by
partystocker on Jan 13, 2022 4:56pm
Phase 2 drilling commenced
$KALO.V has officially commenced is phase 2 drilling program at the company’s wholly owned Vatu Aurum Gold Project. The program will be focused on the Qiriyaga zone, which has delivered some promising results from the phase one program, including:
- KGD 01: 101m @ 0.94g/t gold from 0-101m including 2m @ 6.00g/t gold from 6m-8m; 2m @ 5.36g/t gold from 69m-71m;
- KGD 03: 24m @ 1.01g/t gold from 21m-45m, including 2m @ 6.27g/t gold from 37m-39m; and
- KGD 04: 69m @ 0.96g/t gold from 21m-90m including 2m @ 5.11g/t gold from 34m-38m.
Surveys are showing a potentially much larger system in the Qiriyaga zone, and $KALO is speculating that the system may be the tip of a proverbial iceberg for the system and host a combined historical Inferred mineral resource of 158,831 gold ounces.
https://ceo.ca/@accesswire/kalo-gold-corp-commences-phase-2-drill-program-at
Be the first to comment on this post