Nugget Pond Mill and Tailings facility
As already completed, Maritime conducted a feasibility study to determine the optimal configuration to operate both the Nugget Pond gold circuit and copper concentrator mill concurrently and independently without any impact on Rambler's current operations.
But, as well, Richmont left behind its gold tailings facility from its processing of the High grade ..15.8 grams per ton..ore from the original HammerDown mine .
Gold fines from the crushing circuit would be high grade too, and might provide an early cash flow start up of the Nuggett Pond mill.
Plus, as already posted, the upgrade of the gold circuit would enable the Nugget pond mill to toll mill Firefly's copper- gold production from the Ming mine and/or switch to gold processing concurrently .
This story is just unfolding..