TSXV:MMA - Post Discussion
Post by
Magnum2 on Dec 03, 2020 1:51am
9000M of drill results ahead...(165 holes/6050M.
....as part of the intial WP)........165 holes, they must be shallow....
During the Initial Work Program, the majority of the field work undertaken by Rio Tinto was focused in the area around the 22 Zone and includes: - Infill soil sampling program, completed on 250 metre x 250 metre spacing;
- Airborne geophysical survey collecting magnetic, radiometric and digital terrain modelling data, completed on 50 metre line spacing;
- A natural source audio-frequency magnetotelluric geophysical survey, totalling 72.3 line kilometres;
- A regional gravity survey, 1-3 kilometre spaced; and
- Air core drilling, 165 holes totalling 6,050 metres.
Currently, a 3,000 metre diamond drill program is underway.
Be the first to comment on this post