Post by
mattbigham on Mar 12, 2022 12:07pm
I can't ever remember seeing an 854 m intercept
854 m at 0.26% Cu including 254 m grading 0.41% Cu in drill hole LP-01, both of which ended in mineralization.
395 m grading 0.57% copper equivalent
Drill hole LAP21-02 intersected 416.28 m of 0.28% CuEq (0.23% Cu, 2.57 g/t Ag, 0.026 g/t Au
Drill hole LAP21-01 intersected 380.39 m of 0.27% Copper Equivalent
The main Allard mineralized porphyry system has been drill tested over an area of 3 km x 1 km and shows more than a kilometer of vertical extent.
The system remains open to expansion at depth and along trend.
An adjacent second porphyry center has been recognized at Copper Hill beneath an area of high-grade surface mining.
An additional 16 potential porphyry and epithermal targets have been identified outside of the Allard and Copper Hill areas.