Is this why the stock is gaining interest ? CLAYTON VALLEY BFF-1 PROJECT
The Clayton Valley BFF-1 Lithium Project southern boundary lies 250 meters from Albemarle Corporation’s Silver Peak lithium mine and brine processing operations. The mine has been in operation since 1967 and remains the only brine based lithium producer in North America. It is also the location of Pure Energy Minerals’ 816,000 metric tonnes Lithium Carbonate Equivalent (LCE) Inferred Resource NI 43-101 announced in July 2015. Clayton Valley’s centralized location between Nevada and Reno and its highways, access to power, water and labor provide excellent infrastructure for mineral exploration and development. The Clayton Valley BFF-1 Lithium Project is approximately 3.5 hours away from Tesla’s Gigafactory, which has a planned annual lithium-ion battery production capacity of 35 gigawatt-hours per year by 2020.
Clayton Valley is one of the few locations globally known to contain commercial-grade lithium-enriched brine. The Valley is an internally drained closed-basin and is surrounded by mountains, hills and ridges on all sides. It contains an underground unconsolidated water bearing system (or aquifer system) which is host to lithium-enriched brines and is contained by the surrounding rock.
The claims cover an area of playa, including the Goat Island graben (inferred from gravity inversion; Quantec, 2008; Petrick, 2008), that encompasses a portion of a deep-circulation geothermal system beneath basin-fill sediments locally blanketed with travertine in north-western Clayton Valley. The Goat Island graben segments Clayton Valley into a northerly-trending, 1-2 km-wide sub-basin with a distinct escarpment on each side. Geological modeling and assessment of historical drilling results by J.B. Hulen,